REFERENCES
The company "CORSAIR" DOO is privately owned, founded in 2016. in Užice. It originated from "CORSAIR" SZR, which was established in 2008.
In 2022, the sister company "CORSAIR SPORT" DOO was opened in Bosnia and Herzegovina

01
VIP RED STAR
Assembly of 2,800 pieces of Avangard seats model "POBEDA" with production of metal supports.
02
HEATING OF THE FK CRVENA ZVEZDA FIELD
The project was completed in 2018. The execution time was 40 days.
The project included:
- commissioning of the boiler room in the sports club
- installation of a 400m long heating pipe from the sports club to the western trellis of the "Rajko Mirić" stadium
- Installing automation in the boiler room of the "Rajko Mirić" stadium
- connection with existing pipes in the field
- fault detection and commissioning


03
HEATING OF THE FIELD OF FC PARTIZAN
The project was completed in 2019.
Electric heating of 650kW was installed, with connection to the transformer station.
04
SPORTS HALL LUČANI
The Lucani sports hall project consists of:
- project for the execution of mechanical and plumbing installations
- execution of machine installations
- project


05
"PARTIZAN" HALL, VALJEVO
The reconstruction of the "Partizan" gymnasium in Valljevo consisted of the execution of mechanical installations.
06
SOUTH STAND FC CRVENA ZVEZDA
Procurement and installation of 5,000 chairs on the south side.


07
BORAC BANJA LUKA
The project was completed in 2022.
Electric heating of 650kW was installed, with connection to the transformer station.
08
FREEDOM OF TUZLA
The project was completed in 2022.
Electric heating of 650kW was installed, with connection to the transformer station.


09
FC SARAJEVO
The project was completed in 2022.
Electric heating of 650kW was installed, with connection to the transformer station.
10
FC ŽELJEZNIČAR SARAJEVO
The project was completed in 2023.
It consists of rehabilitation of the field heating system. Whereby the system is centralized





11
SPORTS HALL IN MOSCOW
The project was completed in 2018.
It consists of a conceptual project and a project for execution.
12
STADIUM PODSMOSKOVLJE 4 CATEGORIES
The project was completed in 2019.
It consists of a conceptual project and a project for execution.







13
MIG SPORTS CENTER MOSCOW
Projekat je obavljen 2017. godine.
Sastoji se od idejnog projekta .
14
SHOPPING AND SPORTS CENTER MOSCOW
The project was completed in 2017.
It consists of a conceptual project.







15
UFA STADIUM OF 15,000 SPECTATORS
It consists of a conceptual project:
Number of viewers 15,000
1,500 VIP seats
Compliant with UEFA and FIFA standards
4 categories of stadiums
Sliding roof
Artificial grass field
The universality of the stadium allows it to host other events, concerts, etc.
Parking up to 2,000 spaces
16
FC SLOGA DOBOJ
The project was completed in 2024.
Electric heating of 650kW was installed, with connection to the transformer station.







17
MAINTENANCE OF THE FK BORAC BANJA LUKA FIELD
18
MAINTENANCE OF THE FIELD OF FC TUŠANJ TUZLA






19
MAINTENANCE OF THE FIELD OF THE TRAINING CENTER OF THE SOCCER REPRESENTATION OF BIH
20
MAINTENANCE OF THE FIELD OF NŠK ZRINJSKI







21
BENCHES FOR RESERVE PLAYERS OF NK ŠIROKI BRIJEG
22
BENCHES FOR RESERVE PLAYERS TUZLA





23
FIELD MAINTENANCE NK ŠIROKI BRIJEG
24
MAINTENANCE OF THE FIELD OF FC SLOGA DOBOJ