The company "CORSAIR" DOO is privately owned, founded in 2016. in Užice. It originated from "CORSAIR" SZR, which was established in 2008.

In 2022, the sister company "CORSAIR SPORT" DOO was opened in Bosnia and Herzegovina

VIP Lounge Red Star.jpg

01

VIP RED STAR

Assembly of 2,800 pieces of Avangard seats model "POBEDA" with production of metal supports.

02

HEATING OF THE FK CRVENA ZVEZDA FIELD

The project was completed in 2018. The execution time was 40 days.

The project included:

- commissioning of the boiler room in the sports club

- installation of a 400m long heating pipe from the sports club to the western trellis of the "Rajko Mirić" stadium

- Installing automation in the boiler room of the "Rajko Mirić" stadium

- connection with existing pipes in the field

- fault detection and commissioning

Crvena Zvezda pitch heating.jpg
FC PARTIZAN

03

HEATING OF THE FIELD OF FC PARTIZAN

The project was completed in 2019.

Electric heating of 650kW was installed, with connection to the transformer station.

04

SPORTS HALL LUČANI

The Lucani sports hall project consists of:

- project for the execution of mechanical and plumbing installations

- execution of machine installations

- project

sports-hall-lucani.jpg
Hala partizan valjevo

05

"PARTIZAN"  HALL, VALJEVO

The reconstruction of the "Partizan" gymnasium in Valljevo consisted of the execution of mechanical installations.

06

SOUTH STAND FC CRVENA ZVEZDA

Procurement and installation of 5,000 chairs on the south side.

IMG_20220914_135920154.jpg
BORAC BANJA LUKA.jpg

07

BORAC BANJA LUKA

The project was completed in 2022.

Electric heating of 650kW was installed, with connection to the transformer station.

08

FREEDOM OF TUZLA

The project was completed in 2022.

Electric heating of 650kW was installed, with connection to the transformer station.

Tusanj Tuzla
IMG_20221114_125942850.jpg

09

FC SARAJEVO

The project was completed in 2022.

Electric heating of 650kW was installed, with connection to the transformer station.

10

FC ŽELJEZNIČAR SARAJEVO

The project was completed in 2023.

It consists of rehabilitation of the field heating system. Whereby the system is centralized

stadium-grbavica.jpg

11

SPORTS HALL IN MOSCOW

The project was completed in 2018.

It consists of a conceptual project and a project for execution.

12

STADIUM PODSMOSKOVLJE 4 CATEGORIES

The project was completed in 2019.

It consists of a conceptual project and a project for execution.

13

MIG SPORTS CENTER MOSCOW

Projekat  je obavljen 2017. godine.

Sastoji se od idejnog projekta .

14

SHOPPING AND SPORTS CENTER MOSCOW

The project was completed in 2017.

It consists of a conceptual project.

15

UFA STADIUM OF 15,000 SPECTATORS

It consists of a conceptual project:

  • Number of viewers 15,000

  • 1,500 VIP seats

  • Compliant with UEFA and FIFA standards

  • 4 categories of stadiums

  • Sliding roof

  • Artificial grass field

  • The universality of the stadium allows it to host other events, concerts, etc.

  • Parking up to 2,000 spaces

16

FC SLOGA DOBOJ

The project was completed in 2024.

Electric heating of 650kW was installed, with connection to the transformer station.

17

MAINTENANCE OF THE FK BORAC BANJA LUKA FIELD

18

MAINTENANCE OF THE FIELD OF FC TUŠANJ TUZLA

19

MAINTENANCE OF THE FIELD OF THE TRAINING CENTER OF THE SOCCER REPRESENTATION OF BIH

20

MAINTENANCE OF THE FIELD OF NŠK ZRINJSKI

21

BENCHES FOR RESERVE PLAYERS OF NK ŠIROKI BRIJEG

22

BENCHES FOR RESERVE PLAYERS TUZLA

23

FIELD MAINTENANCE NK ŠIROKI BRIJEG

24

MAINTENANCE OF THE FIELD OF FC SLOGA DOBOJ